    xu@leji.top

Project planning

Unpowered children's play integrated production service provider
According to the customer's commercial use, the main body positioning is recommended for the project with excellent play program and initial budget; according to the basic information provided by the customer, develop a detailed market research plan for the customer.
1.
Market research, competition analysis, and amusement project recommendation
1 Summarize the research results, make a layout and PPT presentation
2 Advantage:
3 Senior team of unpowered amusement equipment planning engineers, rich experience
Cooperation with multiple brand garden design companies
1 More than 20 domestic and foreign large-scale non-powered playground integration successful experience, to ensure the accuracy of market positioning, business planning rationality, project playability
2 cost:
3 Free primary planning and budget
Unpowered children's play integrated production service provider
According to the customer's commercial use, the main body positioning is recommended for the project with excellent play program and initial budget; according to the basic information provided by the customer, develop a detailed market research plan for the customer.

Deepen design

The theme children's park has the characteristics of individuality and uniqueness. Each program has a theme story, which is different from the set of amusement equipment such as the combination slides of the previous standard output. Design concepts based on market research, customer negotiations, and storytelling.
content:
1  Theme story design, sketch production, design concept PPT description
2 Effect drawing, construction drawing production
3 Project budget
Advantage:
1 Professional design team, independent personality design concept: a personalized children's play space for the environment, to meet the children's walking, running, jumping, balancing, casting, climbing, climbing, drilling eight body training functions, while losing personality Modeling space
2 Design team level management to meet different customer needs
3 No free design, providing the foundation for creating a high-end unique design
4 From the renderings to the construction drawings, a team is responsible for ensuring consistency between the physical and the effects.
cost:
1 2 years of experience leading the team: 20 yuan / square
2 More than 5 years experience professional designer team: 40 yuan / square
3 Aiden led team (10 years) professional designer team: 80 yuan / square
4 Brand Cooperation Design Institute: 100-500 yuan / square

Integrated production

120 professional production supporting team, 20,000 square production base, 5 fine production management trainings every year, the craftsman spirit is deeply rooted in the hearts of the people, laying a solid foundation for quality awareness in providing high quality personalized leisure non-standard amusement equipment in China.
Advantage:
1 The production base is equipped with highly educated researchers, with an average age of 30 years, covering optical, electrical, mechanical, welding and other professional directions.
2 5 years focus on non-standard amusement production and management
cost:
Material cost + production cost + basic profit = factory price

Equipment transportation

The theme children's park has the characteristics of individuality and uniqueness. Each program has a theme story, which is different from the set of amusement equipment such as the combination slides of the previous standard output. Design concepts based on market research, customer negotiations, and storytelling.
Transportation principle:
1  Safety and reliability are the first principles of choice for transportation options
2 Economic applicability, three long-term transportation strategic cooperation brand units, adopting a combination of special line and double-line transportation to reduce transportation costs
3 Service humanization, communication in advance, strict requirements for the professional ethics of vehicle drivers, as far as possible to restrict the driver in the form of payment
Advantage:
1 3 long-term transportation strategic cooperation brand units, adopting a combination of special line and double-line transportation to reduce transportation costs
2 Professional loading equipment, supervised by people to ensure accurate delivery and reasonable loading
cost:
1 Estimate the transportation cost by experience, 10% of the value of the goods, can be mutually agreed to retreat less
2 Agent logistics, in the form of payment, designated by Party A to pay

Installation and construction

Installation of amusement equipment in accordance with EN1176 EU standards, ensuring that amusement equipment and playgrounds meet advanced international safety standards; paying attention to installation quality, considering every detail, ensuring integrity in accordance with design requirements from the perspective of safety, durability and aesthetics
Transportation principle:
1   Material check
2 Site effect proofreading
3 Pre-buried construction
4 Main body installation connection
5 Foundation coverage
6 Attachment installation connection
7 Bolt fastening
8 Ground construction
9 Garbage disposal
10 Security check
Advantage:
1 Professional: step-by-step management, engineer rating system to ensure the stability of talent
2 Service: Strict reference to safety standards to ensure that the physical effects are basically non-differentiated
3 Efficiency: professional installation tools, reasonable arrangements to ensure high installation efficiency

cost:
Please consult the salesman
1  Domestic: Estimated transportation cost based on experience, 10% of the value of goods, can be mutually agreed to repay more than 400 yuan / day / person's salary +220 yuan / day / person accommodation catering expenses accounting, vehicle shipping costs
2 Foreign: Estimated transportation cost based on experience, 15% of the value of goods, can be mutually agreed to repay more than 120 US dollars / day / person's salary + 220 yuan / day / person's accommodation and food expenses accounting, vehicle shipping costs

Safety acceptance

Installation of amusement equipment in accordance with EN1176 EU standards, ensuring that amusement equipment and playgrounds meet advanced international safety standards; paying attention to installation quality, considering every detail, ensuring integrity in accordance with design requirements from the perspective of safety, durability and aesthetics
content:
1   Physical inspection of product structure: Carrying safety test tools, checking the assembly of each component according to EN1176 safety standard, whether there is potential risk of pinching, such as fingers, body trunk, head and neck;
2 Adult accessibility test: Check whether the closed aisle, passage, and drill hole diameter have exceeded 76CM, and adults can enter the rescue;
3 Fall protection test: Check whether the fall protection condition of the ground facilities meets the standards according to the relevant conditions of EN1176-1, 10;
4 Barrier risk detection: detecting unpredictable obstacles in the path, preventing potential WeChat
Advantage:
1 The main members of the team have been focusing on R&D and production experience of unpowered amusement equipment for 10 years.
2 National unpowered amusement equipment standard formulation participants, with rich experience in related products
cost:
1 Provide free factory test report
2 Provide third-party venue test report according to actual needs



Management

In the operation process of children's play equipment, the key is safety, safety is concentrated in the two parts of equipment and management, and the focus of operation management is concentrated in these two aspects. Operational training is a theory-to-practice process that allows participants to quickly get to work and ensure the safe operation of the children's playground
content:
1   Daily maintenance of amusement equipment
2 Safe use of amusement equipment
3 Children's Park Rules Training
4 Children's playground activity training
5 Children's park operation training
Advantage:
1 Improve the experience of children's paradise and increase the rate of return
2 Improve park management and improve work efficiency
cost:
Factory free

Service Process

Service Process:
Early communicationConcept planning Deepen design Project budget  Production production  Construction installation Safety acceptance Professional maintenance

Service area

Service Process:
Real estate projectTourism project Theme park project Municipal project  Commercial projects  Educational project

navigation

contact us

Mr. Xu
  xu@leji.top
+ 0086-15167702299
 Wenzhou City, Yongjia County, Qiaoxia Town, Wenzhou Letu Youle Equipment Co., Ltd.
Copyright @温州乐图游乐设备有限公司 All Rights Reserved. RRSXML Site Map